Haier Wormhole | Smart Factory 4.0

Haier Wormhole | Smart Factory 4.0 Project

  • HC WoodTech’s dedicated 10-member engineering team participated in the development and implementation of Haier’s “Wormhole” Smart Factory 4.0 project in Jinan, China, a large-scale automated panel furniture manufacturing facility.
  • Our team handled the project from initial production line planning and engineering design to factory layout optimization, equipment installation, electrical wiring, and system integration.
  • Despite the complexity of the project, the engineering and integration work was carried out by our experienced 10-person team, demonstrating HC WoodTech’s capabilities in delivering large-scale industrial automation solutions.

Complete Production Line Engineering & Installation

  • Our engineering team was responsible for coordinating the entire production line layout, equipment positioning, mechanical installation, electrical connections, and system commissioning.
  • The project included high-efficiency panel cutting and processing equipment, automated material handling systems, conveying and sorting systems, and centralized dust extraction infrastructure.
  • HC WoodTech’s 10-member team coordinated machine connections, electrical integration, dust collection system installation, and production line synchronization to ensure smooth operation across different manufacturing processes.
  • Through careful engineering planning and on-site coordination, the team integrated individual machines and supporting systems into a connected, automated panel manufacturing line.

 

AGV & RGV Automation Integration and Smart Manufacturing

  • A key part of the project involved integrating AGV (Automated Guided Vehicle) and RGV (Rail Guided Vehicle) systems into the factory’s automated material handling and internal logistics operations.
  • Our engineering team worked on the installation, connection, integration, and commissioning of these systems alongside the main production equipment, supporting coordinated material transportation between manufacturing stages.
  • The integrated production line was designed to improve material flow, reduce manual handling, increase production efficiency, and support intelligent manufacturing operations.
  • With just 10 dedicated engineers and technicians, HC WoodTech demonstrated its ability to manage complex factory automation integration, from engineering design and installation through final commissioning and production line coordination.

 

Scroll to Top